According to the Taraxa (TARA) ) team, the Ficus Root upgrade is scheduled at block height 11616000 estimated 07: 00 UTC on 07 August 2024. Gate supports this upgrade and will suspend TARA deposits and withdrawals during the process. Deposits and withdrawals will be resumed as soon as possible after this upgrade.TARA trading will not be affected during the upgrading.